In December 2025, Atlas Cloud AI unveiled a strategic $6 billion initiative to scale its North American AI compute network. The roadmap begins with a $250 million phase-one deployment in partnership with NewYork GreenCloud.
Under the direction of CEO Jerry Tang, Atlas is deploying 288 2CRSi Godì 1.8E2D-NV8 servers, housing a total of 2,304 NVIDIA Blackwell GPUs (HGX B300). The infrastructure is anchored by NVIDIA Quantum-X800 InfiniBand networking—delivering a massive 800 Gbps per GPU—and WEKA high-performance storage, creating a purpose-built environment for hyperscale AI training and low-latency inference.
The cluster is situated at a renewable biomass-powered facility in Ione, California. By leveraging local biomass energy and advanced liquid cooling, NewYork GreenCloud CEO Joe Church confirmed the site will operate with a 1.02 PUE, ensuring carbon-negative operations and Tier III compliance by its February 2026 operational date.
Market Signal
- The “Grid-Bypass” Strategy: The choice of Ione, California—a secondary market—is a strategic move to bypass the 2-to-5-year interconnection queues currently paralyzing Tier 1 hubs like Santa Clara and Ashburn. By tapping into localized biomass energy, Atlas is securing “Time-to-Market” as its primary competitive advantage, delivering Blackwell-class capacity while others remain stalled by utility grid constraints.
- Targeting the “ESG-Mandated” Demand: As Fortune 500 enterprises and government agencies face stricter carbon-reporting mandates, the 1.02 PUE and biomass power source move Atlas from a commodity provider to a “Compliance-as-a-Service” partner. This infrastructure is specifically architected for Sovereign AI and high-stakes inference workloads that require both technical performance and audit-ready sustainability.
- Infrastructure as Intelligence: The integration of 2CRSi Godì specialized servers and Quantum-X800 networking signals a shift away from generic cloud setups. Atlas is building an “AI Factory” in the truest sense, optimized for the high TDP requirements of the Blackwell platform, which many legacy data centers are currently unequipped to handle.
